Thomby Creek 3
Thomby Creek 3 is a petroleum well in the Bowen, Queensland, operated by Bridge, drilled to a total depth of 1,939 m.
Well Information
Drilling Data
- Total Depth
- 1,939 m
- Datum Elevation
- 274.6 m
- Spud Date
- 07/10/1980
- Completion Date
- 25/10/1980
- Permit
- -
- Rig
- National 55
Location
- Latitude
- -27.6546
- Longitude
- 149.0130
Available Log Data
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 197 m | 1923 m | 1726 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 197 m | 1923 m | 1726 m |
Resistivity (1 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LLD | 205 m | 1923 m | 1717 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 206 m | 1922 m | 1715 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 205 m | 1923 m | 1718 m |