Digital Wireline Logs for Thomby Creek 6
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Thomby Creek 6 in the Bowen, Queensland, operated by Bridge, drilled to a total depth of 1,912 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,912 m
- Datum Elevation
- 274.0 m
- Spud Date
- 16/07/1979
- Completion Date
- 01/08/1979
- Permit
- -
- Rig
- XL National T32
Location
- Latitude
- -27.6547
- Longitude
- 149.0180