Digital Wireline Logs for Timothy 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Timothy 1 in the Bowen, Queensland, operated by Sydney, drilled to a total depth of 2,150 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,150 m
- Datum Elevation
- 249.0 m
- Spud Date
- 29/09/1985
- Completion Date
- 20/10/1985
- Permit
- -
Location
- Latitude
- -28.0578
- Longitude
- 149.3140