Skip to content

Yarrabend 1

Bowen, Queensland

Yarrabend 1 is a petroleum well in the Bowen, Queensland, operated by Hartogen, drilled to a total depth of 1,481 m.

Request LAS Files & Well Summary

Well Information

Well Name
Yarrabend 1
Basin
Bowen
State
Queensland
Classification
NEST
Operator
Hartogen
Driller
Richter

Drilling Data

Total Depth
1,481 m
Datum Elevation
234.0 m
Spud Date
22/07/1983
Completion Date
04/08/1983
Permit
-

Location

Latitude
-27.2377
Longitude
148.9070

Available Log Data

1
Log Streams
14
Curves
82,390
Data Points
12,556
Metres

Caliper (3 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 149 m 1480 m 1330 m
CALI 1158 m 1480 m 322 m
CALI 1158 m 1480 m 322 m

Density (2 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 1158 m 1480 m 322 m
RHOB 1158 m 1480 m 322 m

GR (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 140 m 1475 m 1335 m
GR 1158 m 1480 m 322 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 140 m 1480 m 1340 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 1158 m 1480 m 322 m

Resistivity (3 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 151 m 1474 m 1322 m
LLS 151 m 1474 m 1322 m
MSFL 151 m 1477 m 1326 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 149 m 1476 m 1327 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 151 m 1470 m 1319 m