Digital Wireline Logs for Yellowbank 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Yellowbank 5 in the Bowen, Queensland, operated by AGL, drilled to a total depth of 1,514 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,514 M
- Datum Elevation
- 581.6 m
- Spud Date
- 15/05/1989
- Completion Date
- 31/05/1989
- Permit
- -
- Rig
- Rig 19
Location
- Latitude
- -25.4453
- Longitude
- 148.3980