Digital Wireline Logs for Baylam 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Baylam 1 in the Clarence Moreton, Queensland, operated by Phillips, drilled to a total depth of 1,203 m. Ready for immediate petrophysical analysis.
Well Information
- Well Name
- Baylam 1
- Basin
- Clarence Moreton
- State
- Queensland
- Classification
- NEST
- Operator
- Phillips
- Driller
- -
Drilling Data
- Total Depth
- 1,203 m
- Datum Elevation
- 95.1 m
- Spud Date
- 26/09/1965
- Completion Date
- 24/10/1965
- Permit
- -
- Rig
- -
Location
- Latitude
- -27.4881
- Longitude
- 152.3660