Acrus 1
Workstation-Ready Wireline Logs (LAS) & Data Summaries
Quality-controlled, spliced, and depth-matched wireline log data for Acrus 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,746 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,746 m
- Datum Elevation
- 73.7 m
- Spud Date
- 25/03/2002
- Completion Date
- 14/04/2002
- Permit
- PL 131
- Rig
- Rig 18
Location
- Latitude
- -27.7224
- Longitude
- 141.8390