Digital Wireline Logs for Ashby 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Ashby 3 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,153 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,153 m
- Datum Elevation
- 104.8 m
- Spud Date
- 27/01/2005
- Completion Date
- 07/02/2005
- Permit
- Qld PL 129
- Rig
- Rig 18
Location
- Latitude
- -28.2342
- Longitude
- 141.5830