Digital Wireline Logs for Barrolka Northeast 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Barrolka Northeast 2 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,725 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,725 m
- Datum Elevation
- 125.6 m
- Spud Date
- 25/10/1997
- Completion Date
- 16/11/1997
- Permit
- ATP 259 P
- Rig
- Rig 18
Location
- Latitude
- -26.8093
- Longitude
- 141.7090