Digital Wireline Logs for Brumby 8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Brumby 8 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,319 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,319 m
- Datum Elevation
- 83.0 m
- Spud Date
- 29/09/1995
- Completion Date
- 16/10/1995
- Permit
- -
- Rig
- Rig 3
Location
- Latitude
- -28.3997
- Longitude
- 141.0010