Skip to content

Digital Wireline Logs for Callisto 1

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Cooper, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for Callisto 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,877 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Callisto 1
Basin
Cooper
State
Queensland
Classification
NEST
Operator
Santos
Driller
ODE

Drilling Data

Total Depth
1,877 m
Datum Elevation
-
Spud Date
09/10/2003
Completion Date
20/10/2003
Permit
ATP 267 P
Rig
Rig 34

Location

Latitude
-27.3643
Longitude
142.5280