Digital Wireline Logs for Dinojue 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Dinojue 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,506 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,506 m
- Datum Elevation
- -
- Spud Date
- 02/06/2011
- Completion Date
- 14/06/2011
- Permit
- ATP 267 P
- Rig
- Rig 184
Location
- Latitude
- -27.7684
- Longitude
- 142.5950