Digital Wireline Logs for Judga 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Judga 3 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,406 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,406 m
- Datum Elevation
- 78.6 m
- Spud Date
- 09/09/2004
- Completion Date
- 23/09/2004
- Permit
- PL 62
- Rig
- Rig 33
Location
- Latitude
- -27.4279
- Longitude
- 141.0080