Digital Wireline Logs for Karnak 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Karnak 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 3,171 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,171 m
- Datum Elevation
- 94.7 m
- Spud Date
- 05/06/2001
- Completion Date
- 11/01/2001
- Permit
- ATP 259 P
- Rig
- Rig 26
Location
- Latitude
- -26.6636
- Longitude
- 142.0240