Digital Wireline Logs for Miranda 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Miranda 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,134 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,134 m
- Datum Elevation
- 119.0 m
- Spud Date
- 16/05/1994
- Completion Date
- 02/06/1994
- Permit
- -
- Rig
- Rig 3
Location
- Latitude
- -28.1694
- Longitude
- 141.1750