Digital Wireline Logs for Tellus 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tellus 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,588 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,588 m
- Datum Elevation
- 64.0 m
- Spud Date
- 21/03/2001
- Completion Date
- 01/04/2001
- Permit
- PL 84
- Rig
- Rig 1
Location
- Latitude
- -28.3657
- Longitude
- 141.0520