Bindaroo East 1
Bindaroo East 1 is a petroleum well in the Surat, Queensland, operated by Santos, drilled to a total depth of 1,518 m.
Well Information
Drilling Data
- Total Depth
- 1,518 m
- Datum Elevation
- 349.5 m
- Spud Date
- 08/05/1995
- Completion Date
- 16/05/1999
- Permit
- ATP 336P
- Rig
- Rig 19
Location
- Latitude
- -26.6159
- Longitude
- 149.0342
Available Log Data
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALS | 160 m | 1504 m | 1344 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 21 m | 1499 m | 1478 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 21 m | 1513 m | 1491 m |
Resistivity (3 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LLD | 160 m | 1506 m | 1346 m |
| LLS | 160 m | 1506 m | 1346 m |
| MSFL | 160 m | 1500 m | 1340 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 160 m | 1513 m | 1352 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 160 m | 1495 m | 1335 m |