Digital Wireline Logs for Dundee 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Dundee 2 in the Surat, Queensland, operated by Arrow, drilled to a total depth of 294 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 294 m
- Datum Elevation
- -
- Spud Date
- 22/09/2001
- Completion Date
- 01/10/2001
- Permit
- EPP 676
- Rig
- -
Location
- Latitude
- -26.8303
- Longitude
- 150.6000