Digital Wireline Logs for Durham 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Durham 3 in the Surat, Queensland, operated by Tri Star, drilled to a total depth of 914 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 914 m
- Datum Elevation
- -
- Spud Date
- 13/04/1998
- Completion Date
- 01/05/1998
- Permit
- ATP 592 P
- Rig
- Rig 20
Location
- Latitude
- -25.9021
- Longitude
- 149.1420