Digital Wireline Logs for New Royal 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for New Royal 1 in the Surat, Queensland, operated by OCA, drilled to a total depth of 1,565 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,565 m
- Datum Elevation
- 270.3 m
- Spud Date
- 20/07/1995
- Completion Date
- 02/08/1995
- Permit
- -
- Rig
- Rig 19
Location
- Latitude
- -27.0994
- Longitude
- 148.8780