Digital Wireline Logs for New Royal 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for New Royal 3 in the Surat, Queensland, operated by OCA, drilled to a total depth of 1,589 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,589 m
- Datum Elevation
- 270.0 m
- Spud Date
- 22/03/1997
- Completion Date
- 29/03/1997
- Permit
- PL 22
- Rig
- Rig 1
Location
- Latitude
- -27.0956
- Longitude
- 148.8860