Digital Wireline Logs for New Royal 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for New Royal 5 in the Surat, Queensland, operated by OCA, drilled to a total depth of 1,547 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,547 m
- Datum Elevation
- 266.5 m
- Spud Date
- 04/02/2000
- Completion Date
- 18/02/2000
- Permit
- PL 22
- Rig
- W/04
Location
- Latitude
- -27.0876
- Longitude
- 148.8760