Digital Wireline Logs for New Royal 7
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for New Royal 7 in the Surat, Queensland, operated by OCA, drilled to a total depth of 1,545 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,545 m
- Datum Elevation
- 266.1 m
- Spud Date
- 17/02/2000
- Completion Date
- 25/02/2000
- Permit
- PL 22
- Rig
- W/04
Location
- Latitude
- -27.1055
- Longitude
- 148.8740