Skip to content

Trumpeter 1

Gippsland, Victoria

Trumpeter 1 is a petroleum well in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 3,468 m.

Request LAS Files & Well Summary

Well Information

Well Name
Trumpeter 1
Basin
Gippsland
State
Victoria
Classification
FEST
Operator
Esso
Driller
South Seas
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,468 m
Datum Elevation
21.0 m
Spud Date
18/09/1989
Completion Date
12/10/1989
Permit
Vic / L5

Location

Latitude
-38.4134
Longitude
148.3491

Available Log Data

3
Log Streams
36
Curves
432,130
Data Points
65,859
Metres

Accelerometer (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
AZ 2554 m 3458 m 904 m

Borehole Geometry (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TVD 2553 m 3455 m 902 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 2395 m 3457 m 1062 m
CALS 220 m 3447 m 3227 m

Chromato (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BUTA 3159 m 3460 m 300 m
ETHA 1670 m 3464 m 1794 m
METH 861 m 3465 m 2604 m
MTEM 91 m 3447 m 3356 m
PENT 3224 m 3458 m 234 m
PROP 1758 m 3464 m 1706 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 2395 m 3457 m 1062 m
PEF 2395 m 3457 m 1062 m
RHGX 2395 m 3457 m 1062 m
RHOB 2395 m 3457 m 1062 m

GR (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 91 m 3448 m 3356 m
GRD 2470 m 3464 m 993 m

Miscellaneous (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 2469 m 3466 m 997 m
DEPT 830 m 3465 m 2634 m
DEPT 91 m 3463 m 3371 m
INC 2554 m 3458 m 904 m

Mudlog (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 2470 m 3466 m 996 m
ROP 830 m 3465 m 2634 m
TGAS 861 m 3465 m 2604 m
WOB 2470 m 3466 m 996 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 2395 m 3457 m 1062 m
TNPH 2395 m 3457 m 1062 m

Resistivity (8 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 815 m 3463 m 2647 m
LLS 815 m 3463 m 2647 m
MRES 91 m 3447 m 3356 m
MSFC 228 m 3447 m 3219 m
MSFL 228 m 3447 m 3219 m
SN 2469 m 3461 m 992 m
SNC 2470 m 3464 m 993 m
TEMP 2470 m 3466 m 996 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 230 m 3440 m 3210 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 815 m 3432 m 2617 m