Barwo 2
Barwo 2 is a petroleum well in the Murray, Victoria, operated by Vic Mines, drilled to a total depth of 254 m.
Well Information
Drilling Data
- Total Depth
- 254 m
- Datum Elevation
- -
- Spud Date
- -
- Completion Date
- 13/08/1973
- Permit
- -
- Rig
- -
Location
- Latitude
- -36.0109
- Longitude
- 145.2310
Available Log Data
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 4 m | 219 m | 215 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 4 m | 253 m | 249 m |
Resistivity (2 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LN | 14 m | 252 m | 237 m |
| SN | 14 m | 252 m | 237 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 19 m | 253 m | 234 m |