Skip to content

Miram Piram 5

Murray, Victoria

Miram Piram 5 is a petroleum well in the Murray, Victoria, operated by Vic Mines, drilled to a total depth of 170 m.

Request LAS Files & Well Summary

Well Information

Well Name
Miram Piram 5
Basin
Murray
State
Victoria
Classification
-
Operator
Vic Mines
Driller
-

Drilling Data

Total Depth
170 m
Datum Elevation
-
Spud Date
-
Completion Date
08/06/1905
Permit
-
Rig
-

Location

Latitude
-36.2573
Longitude
141.2860

Available Log Data

1
Log Streams
12
Curves
11,356
Data Points
1,732
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 0 m 169 m 169 m

Density (2 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
LDEN 0 m 173 m 172 m
SDEN 0 m 175 m 174 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 4 m 168 m 163 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 0 m 175 m 175 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NEUT 4 m 170 m 165 m

Resistivity (4 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LN 79 m 170 m 90 m
SN 54 m 169 m 115 m
SPR 54 m 167 m 113 m
TEMP 0 m 171 m 171 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 64 m 167 m 103 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 52 m 169 m 117 m