Miram Piram 5
Miram Piram 5 is a petroleum well in the Murray, Victoria, operated by Vic Mines, drilled to a total depth of 170 m.
Well Information
Drilling Data
- Total Depth
- 170 m
- Datum Elevation
- -
- Spud Date
- -
- Completion Date
- 08/06/1905
- Permit
- -
- Rig
- -
Location
- Latitude
- -36.2573
- Longitude
- 141.2860
Available Log Data
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 0 m | 169 m | 169 m |
Density (2 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| LDEN | 0 m | 173 m | 172 m |
| SDEN | 0 m | 175 m | 174 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 4 m | 168 m | 163 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 0 m | 175 m | 175 m |
Neutron (1 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NEUT | 4 m | 170 m | 165 m |
Resistivity (4 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LN | 79 m | 170 m | 90 m |
| SN | 54 m | 169 m | 115 m |
| SPR | 54 m | 167 m | 113 m |
| TEMP | 0 m | 171 m | 171 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 64 m | 167 m | 103 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 52 m | 169 m | 117 m |