Digital Wireline Logs for Mitiamo 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Mitiamo 1 in the Murray, Victoria, operated by Vic Mines, drilled to a total depth of 84 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 84 m
- Datum Elevation
- -
- Spud Date
- -
- Completion Date
- 23/10/1985
- Permit
- -
- Rig
- -
Location
- Latitude
- -36.2113
- Longitude
- 144.2800
Available Log Data
1
Log Streams
2
Curves
1,088
Data Points
166
Metres
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 0 m | 83 m | 82 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 0 m | 83 m | 82 m |