Skip to content

Thistle 1

Otway, Victoria

Thistle 1 is a petroleum well in the Otway, Victoria, operated by Origin, drilled to a total depth of 2,265 m.

Request LAS Files & Well Summary

Well Information

Well Name
Thistle 1
Basin
Otway
State
Victoria
Classification
FESS
Operator
Origin
Driller
Stena
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,265 m
Datum Elevation
25.0 m
Spud Date
19/04/2012
Completion Date
19/05/2012
Permit
VIC P 43

Location

Latitude
-38.9666
Longitude
142.8910

Available Log Data

3
Log Streams
46
Curves
445,579
Data Points
74,588
Metres

Other (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CHRS 1941 m 2252 m 310 m
CHSM 591 m 1935 m 1344 m
SPM1 100 m 2265 m 2165 m
SPM2 100 m 2265 m 2165 m
SPM3 112 m 1965 m 1852 m

Borehole Geometry (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TVD 100 m 2265 m 2165 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
ADIA 628 m 2237 m 1609 m
DCAV 628 m 2237 m 1609 m

Chromato (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CO2 632 m 2262 m 1630 m
ETHA 631 m 2262 m 1631 m
FLIN 100 m 2265 m 2165 m
IBUT 633 m 2262 m 1629 m
IPEN 631 m 2262 m 1631 m
METH 631 m 2262 m 1631 m
NBUT 632 m 2262 m 1630 m
NPEN 631 m 2262 m 1631 m
PROP 631 m 2262 m 1631 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 628 m 2237 m 1609 m
PEF 628 m 2237 m 1609 m
RHOB 628 m 2237 m 1609 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 100 m 2261 m 2161 m

Miscellaneous (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 100 m 2265 m 2165 m
DEPT 631 m 2262 m 1631 m
DEPT 100 m 2265 m 2165 m

Mudlog (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DHAP 628 m 2261 m 1633 m
DHAT 628 m 2261 m 1633 m
ECD 628 m 2261 m 1633 m
ROP 100 m 2265 m 2165 m
ROP5 100 m 2265 m 2165 m
RPM 100 m 2265 m 2165 m
RPMS 100 m 2265 m 2165 m
SPP 100 m 294 m 194 m
TGAS 631 m 2262 m 1631 m
TORQ 100 m 1961 m 1861 m
WOB 100 m 2265 m 2165 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
TNPH 574 m 2236 m 1661 m

Resistivity (4 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
A40H 628 m 2261 m 1633 m
P16H 628 m 2261 m 1633 m
P28H 628 m 2261 m 1633 m
P40H 628 m 2261 m 1633 m

Sonic (6 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
CHCO 591 m 1935 m 1344 m
CHRA 1941 m 2252 m 311 m
DTCO 591 m 2252 m 1660 m
DTRA 1941 m 2252 m 311 m
DTRS 1941 m 2252 m 310 m
DTSM 591 m 2252 m 1660 m