Skip to content

Petrel 1

Bonaparte, Northern Territory

Petrel 1 is a petroleum well in the Bonaparte, Northern Territory, operated by ARCO, drilled to a total depth of 3,980 m.

Request LAS Files & Well Summary

Well Information

Well Name
Petrel 1
Basin
Bonaparte
State
Northern Territory
Classification
FEST
Operator
ARCO
Driller
Sedco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,980 m
Datum Elevation
34.4 m
Spud Date
12/05/1969
Completion Date
06/08/1969
Permit
NT P 3

Location

Latitude
-12.8264
Longitude
128.4742

Available Log Data

2
Log Streams
12
Curves
238,306
Data Points
36,318
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 275 m 3200 m 2925 m

Density (2 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 274 m 3206 m 2931 m
RHOB 274 m 3205 m 2931 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 121 m 3199 m 3078 m

Miscellaneous (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 284 m 3657 m 3373 m
DEPT 121 m 3206 m 3084 m

Mudlog (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 284 m 3657 m 3373 m

Resistivity (3 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
IND 277 m 3199 m 2921 m
MLL 274 m 3201 m 2926 m
SN 277 m 3200 m 2923 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 282 m 3202 m 2919 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 277 m 3205 m 2928 m