Laurel Downs 1 BMR 2
Laurel Downs 1 BMR 2 is a petroleum well in the Canning, Western Australia, operated by BMR, drilled to a total depth of 1,219 m.
Well Information
Drilling Data
- Total Depth
- 1,219 m
- Datum Elevation
- 171.9 m
- Spud Date
- 08/12/1955
- Completion Date
- 11/05/1956
- Permit
- PL 30H
Location
- Latitude
- -18.1233
- Longitude
- 125.3328
Available Log Data
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 0 m | 1219 m | 1219 m |
Mudlog (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ROP | 0 m | 1219 m | 1219 m |
Resistivity (1 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| RES | 80 m | 1217 m | 1136 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 81 m | 1217 m | 1135 m |