Lloyd 3
Lloyd 3 is a petroleum well in the Canning, Western Australia, operated by Kimberley Oil, drilled to a total depth of 1,590 m.
Well Information
- Well Name
- Lloyd 3
- Basin
- Canning
- State
- Western Australia
- Classification
- NAIN
- Operator
- Kimberley Oil
- Driller
- Kimberley
- Data Summary
- Partial WDS Available
Drilling Data
- Total Depth
- 1,590 m
- Datum Elevation
- 42.6 m
- Spud Date
- 27/06/1998
- Completion Date
- 23/07/1998
- Permit
- PL 8
- Rig
- Rig 6
Location
- Latitude
- -17.4698
- Longitude
- 124.2517
Comments
No open hole wireline logs run. GR-CCL prints in WCR
Available Log Data
Chromato (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| METH | 690 m | 1589 m | 899 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 1335 m | 1566 m | 230 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 192 m | 1589 m | 1397 m |
Mudlog (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ROP | 192 m | 1589 m | 1397 m |