Skip to content

Glencoe 1

Carnarvon, Western Australia

Glencoe 1 is a petroleum well in the Carnarvon, Western Australia, operated by Hess, drilled to a total depth of 3,410 m.

Request LAS Files & Well Summary

Well Information

Well Name
Glencoe 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Hess
Driller
TransOcean
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,410 m
Datum Elevation
29.0 m
Spud Date
22/05/2008
Completion Date
01/07/2008
Permit
WA 390 P

Location

Latitude
-20.0925
Longitude
113.8060

Available Log Data

12
Log Streams
162
Curves
887,958
Data Points
135,367
Metres

Borehole Geometry (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TVD 1151 m 3410 m 2259 m
TVD 2672 m 2771 m 99 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HCAL 2645 m 3385 m 740 m
HDAR 2592 m 3385 m 793 m

Chromato (20 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 1944 m 3410 m 1466 m
ETHA 2672 m 2771 m 99 m
IBUT 1944 m 3410 m 1466 m
IBUT 2672 m 2771 m 99 m
IPEN 1944 m 3410 m 1466 m
IPEN 2672 m 2771 m 99 m
MDOU 1151 m 3410 m 2259 m
MDOU 2672 m 2771 m 99 m
METH 1944 m 3410 m 1466 m
METH 2672 m 2771 m 99 m
MTIN 1151 m 3410 m 2259 m
MTIN 2672 m 2771 m 99 m
MTOU 1151 m 3410 m 2259 m
MTOU 2672 m 2771 m 99 m
NBUT 1944 m 3410 m 1466 m
NBUT 2672 m 2771 m 99 m
NPEN 1944 m 3410 m 1466 m
NPEN 2672 m 2771 m 99 m
PROP 1944 m 3410 m 1466 m
PROP 2672 m 2771 m 99 m

CMR (27 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 2704 m 3005 m 300 m
CBF1 2704 m 3005 m 300 m
CBF2 2704 m 3005 m 300 m
CBF3 2704 m 3005 m 300 m
CBF4 2704 m 3005 m 300 m
CBF5 2704 m 3005 m 300 m
CBF6 2704 m 3005 m 300 m
CBF7 2704 m 3005 m 300 m
CBP1 2704 m 3005 m 300 m
CBP2 2704 m 3005 m 300 m
CBP3 2704 m 3005 m 300 m
CBP4 2704 m 3005 m 300 m
CBP5 2704 m 3005 m 300 m
CBP6 2704 m 3005 m 300 m
CBP7 2704 m 3005 m 300 m
CBP8 2704 m 3005 m 300 m
CFF1 2704 m 3005 m 300 m
CFF2 2704 m 3005 m 300 m
CFF3 2704 m 3005 m 300 m
CFF4 2704 m 3005 m 300 m
CFF5 2704 m 3005 m 300 m
CFF6 2704 m 3005 m 300 m
CFF7 2704 m 3005 m 300 m
CMFF 2704 m 3005 m 300 m
KSDR 2704 m 3005 m 300 m
KTIM 2704 m 3005 m 300 m
TCMR 2704 m 3005 m 300 m

Density (6 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DSOZ 2648 m 3385 m 737 m
HDRA 2648 m 3385 m 737 m
PEF8 2648 m 3385 m 737 m
PEFZ 2648 m 3385 m 737 m
RHO8 2648 m 3385 m 737 m
RHOZ 2648 m 3385 m 737 m

GR (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 2592 m 3380 m 788 m
EHGR 2592 m 3380 m 788 m
GR 2592 m 3380 m 788 m
HBHK 2592 m 3282 m 689 m
HCGR 2592 m 3368 m 776 m
HFK 2592 m 3368 m 776 m
HGR 2592 m 3380 m 788 m
HSGR 2592 m 3368 m 776 m
HTHO 2592 m 3369 m 777 m
HURA 2592 m 3368 m 776 m
SGRC 2640 m 2705 m 65 m
SGRC 1180 m 3400 m 2220 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CS 2592 m 3413 m 820 m
TENS 2592 m 3413 m 820 m

Miscellaneous (14 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 1944 m 3410 m 1466 m
DEPTH 1151 m 3410 m 2259 m
DEPTH 2640 m 2716 m 75 m
DEPTH 2645 m 3385 m 740 m
DEPTH 2648 m 3407 m 758 m
DEPTH 2592 m 3413 m 820 m
DEPTH 2592 m 3385 m 793 m
DEPTH 2704 m 3005 m 300 m
DEPTH 2585 m 3383 m 798 m
DEPTH 1180 m 3410 m 2230 m
DEPTH 2672 m 2771 m 99 m
DEPTH 2672 m 2771 m 99 m
MFIN 1151 m 3410 m 2259 m
MFIN 2672 m 2771 m 99 m

Mudlog (32 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 1151 m 3410 m 2259 m
BITT 2672 m 2771 m 99 m
DXC 1151 m 3410 m 2259 m
DXC 2672 m 2771 m 99 m
ECD 1151 m 3410 m 2259 m
ECD 2672 m 2771 m 99 m
MDIN 1151 m 3410 m 2259 m
MDIN 2672 m 2771 m 99 m
RETD 1151 m 3410 m 2259 m
RETD 2672 m 2771 m 99 m
ROP 1151 m 3410 m 2259 m
ROP 2672 m 2771 m 99 m
RPMB 1151 m 3410 m 2259 m
RPMB 2672 m 2771 m 99 m
RPMS 1151 m 3410 m 2259 m
RPMS 2672 m 2771 m 99 m
SPP 1151 m 3410 m 2259 m
SPP 2672 m 2771 m 99 m
SROP 2662 m 2716 m 53 m
SROP 1195 m 3410 m 2214 m
TGAS 1944 m 3410 m 1466 m
TGAS 1151 m 3410 m 2259 m
TGAS 2672 m 2771 m 99 m
TGAS 2672 m 2771 m 99 m
TORQ 1151 m 3410 m 2259 m
TORQ 1151 m 3410 m 2259 m
TORQ 2672 m 2771 m 99 m
TORQ 2672 m 2771 m 99 m
TREV 1151 m 3410 m 2259 m
TREV 2672 m 2771 m 99 m
WOB 1151 m 3410 m 2259 m
WOB 2672 m 2771 m 99 m

Neutron (5 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 2592 m 3382 m 790 m
HTNP 2592 m 3382 m 790 m
HTNP 2585 m 3383 m 798 m
NPHI 2592 m 3384 m 792 m
TNPH 2592 m 3384 m 792 m

Resistivity (35 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
AF10 2648 m 3407 m 758 m
AF20 2648 m 3407 m 758 m
AF30 2648 m 3407 m 758 m
AF60 2648 m 3407 m 758 m
AF90 2648 m 3407 m 758 m
AFRT 2648 m 3407 m 758 m
AFRX 2648 m 3407 m 758 m
AT10 2648 m 3407 m 758 m
AT20 2648 m 3407 m 758 m
AT30 2648 m 3407 m 758 m
AT60 2648 m 3407 m 758 m
AT90 2648 m 3407 m 758 m
ATRT 2648 m 3407 m 758 m
ATRX 2648 m 3407 m 758 m
HMIN 2648 m 3385 m 737 m
HMNO 2648 m 3385 m 737 m
HTEM 2592 m 3379 m 787 m
RT 2592 m 3407 m 815 m
RXO8 2648 m 3385 m 737 m
RXOI 2648 m 3384 m 736 m
RXOZ 2648 m 3385 m 737 m
SDDE 2640 m 2703 m 63 m
SDDE 1180 m 3398 m 2218 m
SEDP 2640 m 2703 m 63 m
SEDP 1214 m 3398 m 2184 m
SEMP 2640 m 2703 m 63 m
SEMP 1214 m 3398 m 2184 m
SESP 2640 m 2703 m 63 m
SESP 1214 m 3398 m 2184 m
SEXP 2640 m 2703 m 63 m
SEXP 1214 m 3398 m 2184 m
SFXE 2640 m 2703 m 63 m
SFXE 1180 m 3398 m 2218 m
STEM 2640 m 2704 m 64 m
STEM 1180 m 3399 m 2219 m

Sonic (5 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT4S 2638 m 3394 m 756 m
DTCO 2592 m 3395 m 803 m
DTSM 2638 m 3394 m 756 m
PR 2638 m 3394 m 756 m
VPVS 2592 m 3413 m 820 m