Lawley 1
Lawley 1 is a petroleum well in the Carnarvon, Western Australia, operated by Hudbay, drilled to a total depth of 1,120 m.
Well Information
Drilling Data
- Total Depth
- 1,120 m
- Datum Elevation
- 9.4 m
- Spud Date
- 10/08/1981
- Completion Date
- 29/08/1981
- Permit
- WA 58 P
- Rig
- North Sea
Location
- Latitude
- -19.9058
- Longitude
- 117.0090
Available Log Data
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 466 m | 1112 m | 646 m |
Density (1 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| RHOB | 215 m | 1115 m | 900 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 224 m | 1111 m | 887 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 215 m | 1117 m | 901 m |
Neutron (1 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPHI | 483 m | 1117 m | 633 m |
Resistivity (3 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| ILD | 230 m | 1113 m | 883 m |
| ILM | 229 m | 1111 m | 882 m |
| MSFL | 230 m | 1114 m | 883 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 481 m | 1111 m | 630 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 224 m | 1110 m | 886 m |