Parker 1
Parker 1 is a petroleum well in the Carnarvon, Western Australia, operated by Woodside, drilled to a total depth of 4,737 m.
Well Information
Drilling Data
- Total Depth
- 4,737 m
- Datum Elevation
- 8.0 m
- Spud Date
- 26/11/1979
- Completion Date
- 01/04/1980
- Permit
- WA 28 P
Location
- Latitude
- -20.0022
- Longitude
- 115.6690
Available Log Data
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 381 m | 4469 m | 4087 m |
Density (2 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| DRHO | 390 m | 3504 m | 3114 m |
| RHOB | 389 m | 4460 m | 4070 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 71 m | 4467 m | 4396 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 71 m | 4476 m | 4404 m |
Neutron (1 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPHI | 1855 m | 4470 m | 2615 m |
Resistivity (5 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| ILD | 390 m | 4469 m | 4079 m |
| LLD | 4001 m | 4301 m | 299 m |
| LLS | 4001 m | 4301 m | 299 m |
| MSFL | 4001 m | 4301 m | 299 m |
| SFLU | 390 m | 4469 m | 4079 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 389 m | 4471 m | 4081 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 390 m | 4476 m | 4086 m |