Digital Wireline Logs for Tallaganda 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tallaganda 1 in the Carnarvon, Western Australia, operated by BHPB, drilled to a total depth of 4,365 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 4,365 M
- Datum Elevation
- -999.2 m
- Spud Date
- 01/03/2011
- Completion Date
- 18/04/2012
- Permit
- WA 351 P
- Rig
- Atwood Eagle
Location
- Latitude
- -20.8750
- Longitude
- 113.7430