Digital Wireline Logs for Wandagee CH3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wandagee CH3 in the Carnarvon, Western Australia, operated by Wapet, drilled to a total depth of 223 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 223 m
- Datum Elevation
- 56.0 m
- Spud Date
- 30/01/1962
- Completion Date
- 02/02/1962
- Permit
- -
- Rig
- -
Location
- Latitude
- -23.8297
- Longitude
- 114.3360
Comments
No Logs