Alisma 2
Workstation-Ready Wireline Logs (LAS) & Data Summaries
Quality-controlled, spliced, and depth-matched wireline log data for Alisma 2 in the Cooper, Australia, operated by Santos, drilled to a total depth of 2,858 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,858 m
- Datum Elevation
- 81.0 m
- Spud Date
- 24/03/2005
- Completion Date
- 08/04/2005
- Permit
- SA PPL 85
- Rig
- Rig 32
Location
- Latitude
- -28.2429
- Longitude
- 140.9450