Lynedoch 2
Lynedoch 2 is a petroleum well in the Arafura, Northern Territory, operated by Shell, drilled to a total depth of 4,225 m.
Well Information
Drilling Data
- Total Depth
- 4,225 m
- Datum Elevation
- 25.0 m
- Spud Date
- 04/11/1998
- Completion Date
- 24/12/1998
- Permit
- NT-P-49
- Rig
- Ocean Bounty
Location
- Latitude
- -9.7852
- Longitude
- 130.4071
Available Log Data
Borehole Geometry (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEVI | 3880 m | 4224 m | 343 m |
| HAZI | 3880 m | 4224 m | 343 m |
Caliper (3 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 3886 m | 4220 m | 334 m |
| CALS | 2199 m | 4206 m | 2007 m |
| HDAR | 3886 m | 3919 m | 33 m |
Chromato (6 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ETHA | 2375 m | 4229 m | 1854 m |
| IBUT | 3797 m | 4229 m | 431 m |
| METH | 500 m | 4229 m | 3729 m |
| MTEM | 250 m | 4224 m | 3974 m |
| PENT | 3799 m | 4229 m | 430 m |
| PROP | 2689 m | 4229 m | 1540 m |
Density (3 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| DRHO | 3890 m | 4220 m | 330 m |
| PEF | 3890 m | 3915 m | 25 m |
| RHOB | 3890 m | 4220 m | 330 m |
GR (6 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| CGR | 3884 m | 4210 m | 326 m |
| GR | 250 m | 3886 m | 3635 m |
| POTA | 3884 m | 4210 m | 326 m |
| SGR | 3884 m | 4210 m | 326 m |
| THOR | 3884 m | 3906 m | 21 m |
| URAN | 3884 m | 4210 m | 326 m |
Miscellaneous (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 290 m | 4229 m | 3939 m |
| DEPT | 250 m | 4224 m | 3974 m |
Mudlog (3 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ROP | 293 m | 4229 m | 3936 m |
| TGAS | 500 m | 4229 m | 3729 m |
| WOB | 290 m | 4229 m | 3939 m |
Neutron (2 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPHI | 3880 m | 3912 m | 31 m |
| TNPH | 3880 m | 4216 m | 336 m |
Resistivity (6 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LLD | 2202 m | 4222 m | 2020 m |
| LLG | 2202 m | 4222 m | 2020 m |
| LLS | 2202 m | 4222 m | 2020 m |
| MRES | 250 m | 4224 m | 3974 m |
| MSFC | 2202 m | 4206 m | 2004 m |
| MSFL | 2202 m | 4206 m | 2004 m |
Sonic (6 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 2199 m | 3881 m | 1682 m |
| DTCO | 3796 m | 4216 m | 420 m |
| DTL | 2199 m | 3881 m | 1682 m |
| DTSM | 3796 m | 4216 m | 420 m |
| PR | 3796 m | 4216 m | 420 m |
| VPVS | 3796 m | 4216 m | 420 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 2202 m | 4189 m | 1987 m |