Skip to content

Jabiru 12

Browse, Northern Territory

Jabiru 12 is a petroleum well in the Browse, Northern Territory, operated by BHP, drilled to a total depth of 1,776 m.

Request LAS Files & Well Summary

Well Information

Well Name
Jabiru 12
Basin
Browse
State
Northern Territory
Classification
FDSC
Operator
BHP
Driller
Sedco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
1,776 m
Datum Elevation
26.0 m
Spud Date
10/12/1991
Completion Date
29/12/1991
Permit
NT AC/L 1

Location

Latitude
-11.9151
Longitude
125.0139

Available Log Data

3
Log Streams
52
Curves
234,861
Data Points
39,190
Metres

Other (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DTR5 1559 m 1758 m 199 m
DTT5 1559 m 1758 m 199 m

Borehole Geometry (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
AZIM 923 m 1766 m 843 m
TVD 923 m 1766 m 843 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 1559 m 1751 m 192 m
CALS 494 m 1743 m 1248 m

Chromato (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 1240 m 1774 m 533 m
IBUT 1506 m 1716 m 210 m
METH 1100 m 1774 m 674 m
MTEM 140 m 1769 m 1628 m
NBUT 1353 m 1732 m 378 m
PROP 1242 m 1774 m 532 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 1561 m 1751 m 189 m
PEF 1561 m 1751 m 189 m
RHOB 1561 m 1751 m 189 m

GR (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CGR 1477 m 1741 m 264 m
GR 140 m 1543 m 1403 m
GRD 878 m 1772 m 894 m
POTA 1477 m 1741 m 264 m
SGR 1477 m 1741 m 264 m
THOR 1477 m 1741 m 264 m
URAN 1477 m 1741 m 264 m

Miscellaneous (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 878 m 1777 m 899 m
DEPT 140 m 1779 m 1639 m
DEPT 140 m 1769 m 1628 m
INC 923 m 1766 m 843 m

Mudlog (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 145 m 1775 m 1629 m
ROPS 926 m 1776 m 850 m
TGAS 1100 m 1774 m 674 m
WBCS 926 m 1776 m 850 m
WOB 140 m 1779 m 1639 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 1473 m 1745 m 272 m
TNPH 1473 m 1745 m 272 m

Resistivity (9 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
ILD 494 m 923 m 428 m
ILM 494 m 923 m 428 m
LLD 920 m 1769 m 849 m
LLS 920 m 1769 m 849 m
MSFL 494 m 1748 m 1254 m
RSAX 878 m 1772 m 894 m
RSCX 878 m 1772 m 894 m
SFLU 494 m 900 m 405 m
TCDX 883 m 1775 m 892 m

Sonic (9 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT2 494 m 1571 m 1077 m
DT4P 494 m 1756 m 1261 m
DT4S 495 m 1756 m 1261 m
DT5 920 m 1758 m 838 m
DTCO 494 m 1756 m 1261 m
DTRP 494 m 908 m 413 m
DTRS 496 m 904 m 407 m
DTSM 494 m 1756 m 1261 m
DTTP 494 m 911 m 416 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 494 m 1719 m 1224 m