Skip to content

Warrabkook 1

Browse, Northern Territory

Warrabkook 1 is a petroleum well in the Browse, Northern Territory, operated by BHPBilliton, drilled to a total depth of 3,492 m.

Request LAS Files & Well Summary

Well Information

Well Name
Warrabkook 1
Basin
Browse
State
Northern Territory
Classification
FEST
Operator
BHPBilliton
Driller
Atwood
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,492 m
Datum Elevation
22.3 m
Spud Date
13/12/2007
Completion Date
04/02/2008
Permit
WA 303 P

Location

Latitude
-14.6389
Longitude
120.4169

Available Log Data

9
Log Streams
125
Curves
1,013,711
Data Points
125,793
Metres

Borehole Geometry (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 1896 m 3487 m 1591 m
HAZI 1896 m 3487 m 1591 m
P1AZ 1896 m 3487 m 1591 m
RB 1896 m 3487 m 1591 m

Caliper (5 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
C1 2930 m 3487 m 556 m
C2 2930 m 3487 m 556 m
HCAL 2335 m 3475 m 1140 m
HDAR 2335 m 3487 m 1152 m
HDAR 2335 m 3473 m 1138 m

Chromato (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 2352 m 3492 m 1140 m
FLIN 1537 m 3492 m 1955 m
IBUT 2352 m 3492 m 1140 m
IPENT 2352 m 3492 m 1140 m
MDOU 1537 m 3492 m 1955 m
METH 2352 m 3492 m 1140 m
MTIN 1537 m 3492 m 1955 m
MTOU 1537 m 3492 m 1955 m
NBUT 2352 m 3492 m 1140 m
NPENT 2352 m 3492 m 1140 m
PROP 2352 m 3492 m 1140 m

CMR (27 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 2592 m 2745 m 153 m
CBF1 2592 m 2745 m 153 m
CBF2 2592 m 2745 m 153 m
CBF3 2592 m 2745 m 153 m
CBF4 2592 m 2745 m 153 m
CBF5 2592 m 2745 m 153 m
CBF6 2592 m 2745 m 153 m
CBF7 2592 m 2745 m 153 m
CBP1 2592 m 2745 m 153 m
CBP2 2592 m 2745 m 153 m
CBP3 2592 m 2745 m 153 m
CBP4 2592 m 2745 m 153 m
CBP5 2592 m 2745 m 153 m
CBP6 2592 m 2745 m 153 m
CBP7 2592 m 2745 m 153 m
CBP8 2592 m 2745 m 153 m
CFF1 2592 m 2745 m 153 m
CFF2 2592 m 2745 m 153 m
CFF3 2592 m 2745 m 153 m
CFF4 2592 m 2745 m 153 m
CFF5 2592 m 2745 m 153 m
CFF6 2592 m 2745 m 153 m
CFF7 2592 m 2745 m 153 m
CMFF 2592 m 2745 m 153 m
KSDR 2592 m 2745 m 153 m
KTIM 2592 m 2745 m 153 m
TCMR 2592 m 2745 m 153 m

Density (8 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DSO8 2339 m 3475 m 1136 m
DSOZ 2339 m 3475 m 1136 m
HDRA 2339 m 3475 m 1136 m
HPRA 2339 m 3475 m 1136 m
PEF8 2339 m 3475 m 1136 m
PEFZ 2339 m 3475 m 1136 m
RHO8 2339 m 3475 m 1136 m
RHOZ 2339 m 3475 m 1136 m

Dip and Scan (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DDA 2343 m 3486 m 1142 m
DDIP 2955 m 3486 m 530 m
QUAF 2339 m 3487 m 1148 m

GR (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 2270 m 3469 m 1199 m
EHGR 2270 m 3469 m 1199 m
GR 2270 m 3469 m 1199 m
GR_ARC 2333 m 3048 m 715 m
GR_EDTC 1872 m 3461 m 1589 m
GRM1 1600 m 2330 m 729 m
HGR 2270 m 3469 m 1199 m

Logging Parameters (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CS 2930 m 3487 m 557 m
CS 2270 m 3488 m 1218 m
TENS 2335 m 3487 m 1152 m
TENS 2270 m 3488 m 1218 m

Miscellaneous (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BS 2930 m 3487 m 557 m
DEPT 2930 m 3487 m 557 m
DEPT 1600 m 3492 m 1891 m
DEPT 1537 m 3492 m 1955 m
DEPT 2352 m 3492 m 1140 m
DEPT 1872 m 3487 m 1615 m

Mudlog (19 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
APRS_ARC 2322 m 3049 m 726 m
BITH 1537 m 3492 m 1955 m
DXC 1537 m 3492 m 1955 m
MDIN 1537 m 3492 m 1955 m
PITV 1537 m 3492 m 1955 m
ROP 1537 m 3492 m 1955 m
ROP5 1600 m 2351 m 751 m
ROP5_RM 2353 m 3490 m 1137 m
ROTH 1537 m 3492 m 1955 m
RPMB 1537 m 3492 m 1955 m
SPP 1537 m 3492 m 1955 m
TDEP 1872 m 3487 m 1615 m
TDEP 2270 m 3489 m 1219 m
TDEP 2270 m 3489 m 1219 m
TDEP 2592 m 2745 m 153 m
TGAS 2352 m 3492 m 1140 m
TORQ 1537 m 3492 m 1955 m
TREV 1537 m 3492 m 1955 m
WOB 1537 m 3492 m 1955 m

Neutron (4 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 2270 m 3471 m 1201 m
HTNP 2270 m 3471 m 1201 m
NPHI 2270 m 3471 m 1201 m
TNPH 2270 m 3471 m 1201 m

Resistivity (21 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
HMIN 2339 m 3475 m 1136 m
HMNO 2339 m 3475 m 1136 m
P16H 2334 m 3048 m 714 m
P22H 2334 m 3048 m 714 m
P28H 2334 m 3048 m 714 m
P34H 2334 m 3048 m 714 m
P40H 2334 m 3048 m 714 m
RLA0 2339 m 3480 m 1141 m
RLA1 2339 m 3480 m 1141 m
RLA2 2339 m 3480 m 1141 m
RLA3 2339 m 3480 m 1141 m
RLA4 2339 m 3480 m 1141 m
RLA5 2339 m 3480 m 1141 m
RM_HRLT 2270 m 3489 m 1218 m
RT_HRLT 2339 m 3480 m 1141 m
RXO_HRLT 2339 m 3480 m 1141 m
RXO8 2339 m 3475 m 1136 m
RXOI 2339 m 3475 m 1136 m
RXOZ 2339 m 3475 m 1136 m
TEMP_ARC 2322 m 3048 m 726 m
TEMP_DNI_RT 1600 m 2351 m 751 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO 1883 m 3476 m 1593 m
DTSM 1883 m 3471 m 1588 m
PR 1883 m 3471 m 1588 m
VPVS 1883 m 3471 m 1588 m

SP (2 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 2339 m 3469 m 1130 m
SP1 2994 m 3462 m 468 m

Location Map