Digital Wireline Logs for Cheal 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Cheal 1 in the Taranaki, New Zealand, operated by NZOG, drilled to a total depth of 2,848 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,848 m
- Datum Elevation
- -
- Spud Date
- 04/08/1995
- Completion Date
- 10/09/1995
- Permit
- -
- Rig
- OD&E Rig-16
Location
- Latitude
- -39.3888
- Longitude
- 174.3050