Digital Wireline Logs for Hoki 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Hoki 1 in the Taranaki, New Zealand, operated by AWE, drilled to a total depth of 3,700 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,700 m
- Datum Elevation
- -
- Spud Date
- 05/03/2010
- Completion Date
- 19/04/2010
- Permit
- PEP 38401
- Rig
- Kan Tan 4
Location
- Latitude
- -38.8530
- Longitude
- 172.5310