Digital Wireline Logs for Kupara 1 Re-entry
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Kupara 1 Re-entry in the Taranaki, New Zealand, operated by Fletcher, drilled to a total depth of 2,721 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,721 m
- Datum Elevation
- 215.3 m
- Spud Date
- 14/01/1998
- Completion Date
- 14/02/1998
- Permit
- PML-38138
- Rig
- Rig 252
Location
- Latitude
- -39.2218
- Longitude
- 174.3550