Digital Wireline Logs for Makino 1 1A
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Makino 1 1A in the Taranaki, New Zealand, operated by Bligh, drilled to a total depth of 4,555 m. Ready for immediate petrophysical analysis.
Well Information
- Well Name
- Makino 1 1A
- Basin
- Taranaki
- State
- New Zealand
- Classification
- NEST
- Operator
- Bligh
- Driller
- Parker Drilling
Drilling Data
- Total Depth
- 4,555 m
- Datum Elevation
- 228.0 m
- Spud Date
- 23/11/2001
- Completion Date
- 11/03/2002
- Permit
- PEP-38728
- Rig
- Parker Rig-188
Location
- Latitude
- -39.4924
- Longitude
- 174.4170