Skip to content

Digital Wireline Logs for Ohanga 2

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Taranaki, New Zealand

Quality-controlled, spliced, and depth-matched wireline log data for Ohanga 2 in the Taranaki, New Zealand, operated by Fletcher Challenge, drilled to a total depth of 4,809 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Ohanga 2
Basin
Taranaki
State
New Zealand
Classification
NEFA
Driller
Parker

Drilling Data

Total Depth
4,809 m
Datum Elevation
78.2 m
Spud Date
29/07/1998
Completion Date
10/11/1998
Permit
PEP 38086

Location

Latitude
-39.0287
Longitude
174.3520