Digital Wireline Logs for Te Popo 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Te Popo 1 in the Taranaki, New Zealand, operated by Fletcher Challenge, drilled to a total depth of 2,920 m. Ready for immediate petrophysical analysis.
Well Information
- Well Name
- Te Popo 1
- Basin
- Taranaki
- State
- New Zealand
- Classification
- NEST
- Operator
- Fletcher Challenge
- Driller
- Parker Drilling
Drilling Data
- Total Depth
- 2,920 m
- Datum Elevation
- 256.0 m
- Spud Date
- 28/04/2001
- Completion Date
- 04/06/2001
- Permit
- PML-38141
- Rig
- Parker Rig-252
Location
- Latitude
- -39.3046
- Longitude
- 174.3600