Digital Wireline Logs for Horotiu Bore 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Horotiu Bore 3 in the Waikato, New Zealand, operated by Unknown, drilled to a total depth of 195 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 195 m
- Datum Elevation
- -
- Spud Date
- 24/12/1913
- Completion Date
- 24/12/1913
- Permit
- -
- Rig
- -
Location
- Latitude
- -37.7047
- Longitude
- 175.1970
Comments
no logs