Digital Wireline Logs for Hides 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Hides 3 in the Papuan, Papua New Guinea, operated by BP, drilled to a total depth of 3,683 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,683 m
- Datum Elevation
- 2,265.0 m
- Spud Date
- 05/04/1990
- Completion Date
- 07/06/1993
- Permit
- -
- Rig
- Rig 226
Location
- Latitude
- 0.0000
- Longitude
- 0.0000