Digital Wireline Logs for Karius 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Karius 1 in the Papuan, Papua New Guinea, operated by BP, drilled to a total depth of 3,150 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,150 m
- Datum Elevation
- 2,575.0 m
- Spud Date
- 16/02/1995
- Completion Date
- 16/05/1995
- Permit
- -
- Rig
- Rig 226
Location
- Latitude
- -5.9810
- Longitude
- 142.7090