Digital Wireline Logs for Paua 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Paua 1 in the Papuan, Papua New Guinea, operated by BP, drilled to a total depth of 3,325 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,325 m
- Datum Elevation
- -
- Spud Date
- 24/08/1995
- Completion Date
- 08/01/1996
- Permit
- -
- Rig
- Rig 226
Location
- Latitude
- -6.2484
- Longitude
- 143.1740